
27/2 Simon and Ben work on repairing the fence along the entry road to prevent cattle coming on our new runways

27/2 Ben at work repairing the north fence

27/2 Simon, Geoff, Ben and Brendon repaied the fence in a rapidly convened working bee

27/2

27/2 New topsoil laid over the runways

27/2 More topsoil to be spread over the EW runway at the west end

27/2 EW Runway east end

27/2 NS runway southern end

27/2 Looking south east across the EW runway

27/2 Looking SW across the NS runway

27/2 EW Runway eastern end

27/1 Taking the new track for a test drive

27/2 Road profile - crushed brick and concrete

27/2 Heading west towards Gate 2

27/2 Track along the north side of the MX Shed
Kindly graded by Civilmech for no charge
24/2
24/2
24/2
24/2
24/2 Bill and David enjoy the new field
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2
24/2

24/2

24/2

24/2

22/2 Ben and Vince cement in the gate posts with help from David W
Pics DW

22/2

22/2 Civilmech bring in soil and grade it to level our new runways

22/2

22/2 Lots happening
Pics DW

22/2

22/2 The NS runway takes shape

22/2 Newly graded track looking west from the SEMAC area Soon to be covered in crushed contrete watered and rolled

22/2 Looking east from Gate 2

20/2 Ready, set spray
Brendon attacks the blackberries

20/2 Pics of the runway grading work from Brendon

20/2 Looking west down the EW runway to the cross and the NS runway

20/2 Pic of the NS runway looking south from Brendon

20/2 Again looking west down the EW runway to the cross and NS runway Pic from from Brendon

18/2 Civilmech equipment onsite at MX ready to begin the earthworks

18/2 Dino shuts the gate

18/2 David W checks out Civilmech’s string line marking the north side of the new road

18/2 Pink stake marking the 2nd wet areas requiring geofabric over poly pipe

18/2 David talks to Dirk of Civilmech near Gate 2

18/2 David Wheeler shows Ryan and Dirk of Civil mech SEMAC’s layout

18/2 View from the dam to the south east
All gorse has now been slashed by Glen of MX

18/2 View from the dam looking south west again showning the gorse has been cleared

18/2 View from the dam looking north west

18/2 View from the dam looking north

18/2 View from the dam looking east

18/2 Leaving the experts to it

10/2 Rob and David get busy driving in markers in preparation for the earthworks commencing 15/2

10/2 Dino checks the stake at the east end of the EW runway

10/2 David and Rob at the flight line marker

10/2 Mr Wheeler’s schematic for Civilmech’s engineers
Based on JJ’s master plans previously approved by council

3/2 David W learns to drive the gorse slasher under instruction from Glen of MX

2/2 AGM Attendees

2/2 Rod, Simon and Geoff present to the AGM

2/2 Col Vandersluys’ ‘BITS’ is admired by Rob, Bill and Mario

2/2 Mario admires Dinos ‘Miss Vintage’ scratch build


2/2 Col and Simon chat at the AGM

2/2 Bill and Rob also admire Dino’s craftsmanship
SIMON’s SERMON - FEB 2021
Hi All,
I will provide my sermon shortly. In the meantime here is a link to a video of our field taken on Sunday 21st February.
https://drive.google.com/file/d/1rsNJ5KThDFromhsax7WOsk_kyXCazywx/view?usp=sharing
Regards,
Simon